04-17-2006, 02:14 PM
Ok, we have a lot of work to do Friday....
I figure we will utilize at least 4 teams of two working on laying out the OB string. I figure we will use more string instead of paint as the chance of rain could wash away paint. We will keep the string as flush to the ground as possible with exception of the OB lakes on #5. Those strings will be placed higher to trap rollers from going through them.
I will start crews on hole 1,9,10, and 18. 1 and 10 will work forward, 9 and 18 will work backward. They will string fairways until they meet.
Each group needs to have a working cell phone as this is how you will communicate with me concerning questions, and I can get to you to clarify problems, find solutions.
I will need a team of two to start hanging mando signs. TK has given screws, I will provide extras.
We need a 6ft ladder, and a electric screwdriver to install the signs.
I will need this crew to dedicate themselves to show up at 7:30am Saturday morning to quality check ropes/signs to ensure they were not destroyed by late night wanderers.
This crew will assist in moving #16 ropes and basket after round two Saturday evening to set up for the Sunday round.
This crew will show up at 8:00am Sunday to quality check the ropes/signs again. After the completion of the 3rd and final round. I will need this crew to clean up the ropes/signs/and stakes. There will be no markings from the tournament once we leave on Sunday, with exception to paint that has been laid out, that will eventually wash away.
Again, thank you very much for helping out. I could not do it without you all.
I figure we will utilize at least 4 teams of two working on laying out the OB string. I figure we will use more string instead of paint as the chance of rain could wash away paint. We will keep the string as flush to the ground as possible with exception of the OB lakes on #5. Those strings will be placed higher to trap rollers from going through them.
I will start crews on hole 1,9,10, and 18. 1 and 10 will work forward, 9 and 18 will work backward. They will string fairways until they meet.
Each group needs to have a working cell phone as this is how you will communicate with me concerning questions, and I can get to you to clarify problems, find solutions.
I will need a team of two to start hanging mando signs. TK has given screws, I will provide extras.
We need a 6ft ladder, and a electric screwdriver to install the signs.
I will need this crew to dedicate themselves to show up at 7:30am Saturday morning to quality check ropes/signs to ensure they were not destroyed by late night wanderers.
This crew will assist in moving #16 ropes and basket after round two Saturday evening to set up for the Sunday round.
This crew will show up at 8:00am Sunday to quality check the ropes/signs again. After the completion of the 3rd and final round. I will need this crew to clean up the ropes/signs/and stakes. There will be no markings from the tournament once we leave on Sunday, with exception to paint that has been laid out, that will eventually wash away.
Again, thank you very much for helping out. I could not do it without you all.